Case Studies

  • iTWO Success Story: HENN

    HENN is an international architecture office with offices in Munich, Berlin and Beijing and 65 years of expertise in the fields of culture and office buildings, teaching and research as well as development, production and masterplanning.

    With this project, HENN first made the model in Revit, and then seamlessly transferred the model data directly into iTWO with all the cost elements. iTWO supports very precise detailed cost estimation in the early stage of the project.

    Download the full Case Study PDF
  • iTWO Success Story: MTH Group

    Headquartered in Copenhagen, MT Højgaard Group is known as one of the leading construction and civil engineering companies in the Nordic countries who works with clients throughout Denmark and in multiple countries overseas.

    MTH launched a new business plan with changing productivity being the top priority. With iTWO, the MTH team can run different simulations and various scenarios of a project until they find the ones that have lower risk, lower cost, and higher value which lead to higher productivity.

    Download the full Case Study PDF

 

  • iTWO Success Story: Ed. Züblin AG

    Ed. Züblin AG is a 100 % subsidiary of the STRABAG SE Group. STRABAG SE is a European-based technology group for construction services, a leader in innovation and financial strength.

    Conventional contractual forms often lead to conflict-laden project execution because of inefficient and insufficient planning processes. iTWO was used as the project management standard throughout the entire project lifecycle of the Adidas World of Sports Campus South, from estimation to hand-over.

    Download the full Case Study PDF
  • YIT’s Road to Success with iTWO

    Headquartered in Helsinki, Finland, YIT is the largest residential construction company in Finland and the largest foreign residential construction company in Russia.

    YIT started its iTWO journey since 2014. With the implementation of iTWO, the company can have all the information collected, analysed and distributed from one central system in an easy and fast way. By combining iTWO information with real-time observations from the construction sites, the YIT team can take early indications on where the projects are going and take proactive actions. Besides that, iTWO implementation has been a major change-management process.

    Download the full Case Study PDF

 

  •  iTWO Success Story: Nagpur Metro Rail Corporation Limited (NMRCL)

    Nagpur Metro Rail Corporation Limited (NMRCL) is a Special Purpose Vehicle created for the smooth implementation and operations of the Nagpur Metro Rail Project and is a joint venture of Government of India & Government of Maharashtra, with 50:50 equity.

    For the digital project management solution, Nagpur Metro is using world renowned software. iTWO being the central platform has integration with all these software, so that the team can see all project data in a single platform – iTWO. iTWO integrates 5D BIM simulation. iTWO provides an integrated view of the project by linking 3D model, schedule and cost. This supports timely rectification of the flaws in construction sequencing or schedule by contractors. By comparing planned and actual cost, NMRCL can foresee variations and have tighter control of the cost.

    Download the full Case Study PDF
  •  iTWO Success Story: Deutsche Bahn

    The Deutsche Bahn Group is an international provider of mobility and logistics services and operates worldwide in over 130 countries. More than 300,000 employees work every day to ensure efficient mobility and the associated transport networks for more than 12 million customers daily in rail passenger transport.

    In 2014, DB issued a Europe-wide tender for a new project management system and decided for RIB 5D BIM enterprise solution, iTWO.

    The very first project planned in iTWO 5D was Bahnhof Horrem. Horrem is a carbon-free “Green” station. It’s also the very first carbon-free operated station in Europe.

    Download the full Case Study PDF

This website uses cookies to ensure you get the best experience on our website. Learn More

Accept Cookies